Propagation Room Construction

No Comments

The propagation room is coming along. I was able to get the last 6 fiber boards in place today. These fiber boards need to be taped to eliminate and leaks between the boards.

As you can see from this view, the boards are not completely fitted yet. I am going to have to make some cuts and adjust these boards properly. The 2×4’s are there to keep the boards from curling. I plan on getting this done completed this Saturday. I was able to get several 2×4 boards secured into the wall this week. You might ask why is it taking so long to build two simple walls, and that would be a great question. The answer would be, first of all I’ve been working part time 0500-1000 a.m.to help slow the burn rate of our saved funds that we are living on while off season. So I’m tired, pure and simple. I’ve been trying to get out to the farm as often as possible. Secondly, It has been very muddy on the farm. I had our excavator dump 25 tons of a material that he described as slag. It’s basically crushed stone and the powder associated with the rock. I rented a dingo and laid this material along where the access road are needed and a four foot wide path that leads to the garage door of the high tunnel. This greatly improves getting around on the property, and I’m no longer concerned with getting the truck or trailer stuck now. I really need another 25 tons delivered, but for now I need to remain focused on getting the propagation room completed in time for the hanging basket plugs to arrive in early February.

I bought a hoop bender back in December of last year. The intention of this hoop bender is to create my own hoops for 4 foot wide low tunnel raised beds. One of these beds is planned to run parallel of the high tunnel for the entire 60 feet of the high tunnel and four feet wide. In addition there are plans to have another pad dug just below the high tunnel. This pad will be one hundred twenty feet long, and hopefully I can get a minimum of 20 feet wide. This will allow for considerable growth as we need more growing space.

This pile of rock came from when the excavator dug our water line trench. As you can see this land is very rocky. This is one reason that we will be growing the majority of our plants in raised beds. So we are at a point now that these rocks need to be relocated. Initially my thoughts are that they will go behind the fire pit which you can see in the left side of the above image. The left side of the fire pit is where the hillside begins and the rock would make a good border along the grade change. It may also be a seating option for use of the fire pit. I am wanting to develop this space into at least one, possible two raised beds, then a grassy space with a fence along the entire frontage. So these are some of the short term projects that need to be addressed for the farm to be successful.